Release and notification policy
Zeo Radar is a continuously released product. Instead of a version number we use a date: when we talk about a change we say “the August 26 release”, not “3.2.1”. The reason is simple. The application runs in the browser, everyone is always on the latest version, and there is no option to stay on an older one.
How often we ship
Section titled “How often we ship”Changes go live when they are ready. There is no fixed release day. In practice that means several releases a day in a busy week and one every few days in a quiet one. Every release that touches users is written to the Product changes page.
We do not take the application down during a release. The new version comes in quietly. If you are working in an open tab, you move to it when you refresh the page.
What counts as a breaking change and how it is announced
Section titled “What counts as a breaking change and how it is announced”A breaking change is when something you built stops working without you touching it. In Zeo Radar that can happen in three places:
- If a metric definition changes. If the calculation behind a score changes, old and new values cannot be compared.
- If an export format changes. If the names or the order of CSV columns change, a spreadsheet or an automation reading that file breaks.
- If an endpoint or an integration changes. A log shipper sending bot records, a webhook or an API client is affected.
In those three cases, the announcement comes first and the change second. The announcement runs in this order: a persistent information banner inside the application, an email to account owners, and an entry in this section. At least two weeks are left between the announcement and the change taking effect, and where possible the old behaviour keeps working for a while longer.
If a metric definition changes, history is not recalculated. The date the change started is marked on the chart, so you do not confuse a break caused by the product with a break caused by your brand’s performance.
Maintenance windows
Section titled “Maintenance windows”When planned maintenance is needed, the window is chosen for the weekend, between midnight and 06:00 Turkish time. We do not run scheduled measurements in those hours. Measurements that fall inside the window are picked up from the queue after maintenance ends and complete normally. You do not miss a measurement, it simply finishes late.
Planned maintenance is announced inside the application at least three days in advance. Unplanned outages are handled on the System status page.
Rolling back
Section titled “Rolling back”If a release causes an unexpected problem, the first move is not to write a fix, it is to roll back. The previous version can be restored within minutes, because every release is kept as a separate deployment.
The order we use when deciding to roll back is this:
- Is the problem corrupting data? If it is, roll back immediately and discuss afterwards.
- Is the problem making a screen unusable? If it is, roll back.
- Is the problem annoying but not stopping work? Then the fix goes out in the normal release flow.
A release that has been rolled back does not appear in the change list until it is fixed and shipped again. If an item is on the list, that work is standing in production.
feedback.question
feedback.thanks