Measurement frequency and scheduling
What frequency decides
Section titled “What frequency decides”A measurement asks every active prompt of your brand to each of the five engines and reads the answers that come back. The frequency setting says when that repeats. The setting belongs to the brand, not to the organization: in the same account you can track one brand daily and another weekly.
There are three options: Only when I ask (manual), Every week and Every day. Your plan decides which of them are open. Closed options appear on screen with a lock icon, because offering a button that does nothing would be misleading.
Step by step
Section titled “Step by step”- Pick the brand from the left menu and open the Brand Settings screen.
- In the Measurement frequency section, click one of the three options. The choice is saved instantly.
- When you choose anything other than manual, a Next measurement row appears under the section with the date and time.
- If you want a measurement without waiting for the schedule, use the Measure now button at the top of the page.
- While a measurement runs, follow its state in the top bar: Queued, Asking engines, Reading answers.
Plan and frequency
Section titled “Plan and frequency”| Plan | Options available |
|---|---|
| No plan or Snapshot | Manual only |
| Radar Standard | Manual, weekly |
| Radar Pro | Manual, weekly, daily |
| Custom | Weekly or daily, by agreement |
You cannot measure more often than the plan allows. If the brand setting and the plan disagree, the plan wins: that is what has been paid for.
Queue and delay
Section titled “Queue and delay”The scheduler runs every five minutes and looks for brands that are due. When a brand is due, a job is dropped into the queue and its appointment is moved forward: by one day for daily measurement, by seven days for weekly. That is why the time on the Next measurement row is not the minute the measurement will start, it is the earliest it can start. A few minutes of delay on a busy queue is normal.
Two measurements of the same brand never run at the same time. If one is already queued, collecting or being analysed, a new one is refused. Otherwise a single day would produce two different results and it would be unclear which one was right.
When a measurement passes 25 minutes, a “Taking longer than expected” note appears on screen. Large measurements really can take a long time, and this is not an error. A measurement that passes 45 minutes is treated as stalled and you are asked to try again.
feedback.question
feedback.thanks